Roosevelt High School Renovation and Addition

Team

Architect

Bassetti Architects; Berger Partnership

Contractor

Hoffman Construction Company

Stats

PROJECT TYPE

Education

COMPLETION

2006

PROJECT SIZE

296,600 ft² / 9 acres

MKA ROLE

Structural and Civil Engineer

Seattle, WA

Roosevelt High School Renovation and Addition

This comprehensive upgrade to a nine-acre high school campus included renovating a three-story main building dating back to the 1920s and building a gymnasium, student commons, and a 750-seat theater. MKA’s seismic retrofit employed concrete shear walls, concrete foundations, and concrete-and-steel collectors sized and located to maximize future space flexibility and achieve performance objectives. In addition, MKA’s design incorporated the inherent strength of the existing concrete walls to minimize the upgrade’s scope while adhering to state-of-the-art FEMA 356 Life Safety guidelines. The theater’s design incorporated 80-ft-long steel girders to maximize the ceiling height, sightlines, and programming space. Other features, such as an orchestra pit, full fly space, adjustable acoustics, and a balcony railing incorporating original cast-iron endcaps, elevated the theater experience for performers and visitors. For the civil scope, MKA addressed paving, grading, drainage (including water quality and detention), and utility design for the site. Extensive earthwork related to the construction wing, as well as general site grading, required the design of new concrete retaining walls. MKA designed major water system improvements to mitigate the problem of insufficient fire flow to the building, and provided concept assistance to estimate costs of adding a new one-level, 79-stall parking garage to the site.

Awards

Award of Merit - 2006 Excellence in Masonry Design Awards - Masonry Institute of Washington

Winner, Interior (Commerical) - 2008 Outstanding Project of the Year Awards (for Mehrer Drywall) - Northwest Wall and Ceiling Bureau